8
2.Confirmthatthecableisde-energizedsoitcanbe
safelygrounded.Withtraditionalgear,themedium-
voltagecablesmustbetesteddirectlyusinga
clampstick-mountedtester.Butvoltagetestingwith
VistaUDScanbeaccomplishedsimplyandeasily
withouteveraccessingthecables.Simplyusethe
voltageindicatorsshowninFigure4.Thevoltage
indicatorisevenequippedwithaself-testfunction,
soyoucan“testthetester.”SeeFigure5.
3.Groundthecables.Insteadoftheawkwardtaskof
havingtomovetheelbowstoparkingstands,along
withthegroundingbushingsorelbows,withVista
UDSyouneedonlyrotatetheswitchoperatingshaft
tothe“grounded”position.SeeFigure6.Grounding
caneasilybeconfirmedbylookingthroughthe
viewingwindow.
Thereareevenmorebenefits:Thevoltageindicator
canbefurnishedwithalow-voltagephasingoption.
SeeFigure7.Thisfeatureallowsconfirmationof
properphasingwithouteveraccessingthecables.
VistaUDSallowsfault-locatingandhi-pottingtests
tobeperformedwiththecablesattached—andthe
busenergized.
Photocell for
energizing self-
test feature
Test window
Test button
LCD display
Test circuitry can be powered by
flashlight or bright sun
Place gloved finger over
test button to begin testing
Figure 4. Voltage indicator.
Figure 5. Testing the voltage indicator.
Figure 6. Grounding load-interrupter switch (or fault
interrupter).
Figure 7. Measuring phase-to-phase voltage—Phase
1 to Phase 1.
Comments to this Manuals